The purpose of this role is to be responsible for controlling the entire cost control effort on a panel. The cost control manager generally reports directly to the Project Manager or the Project Controls Manager, and may have one or more Cost Engineers reporting to him. Â The cost control manager could work in a corporate office and simultaneously work on multiple projects within the panel.The cost control manager may be directly or indirectly responsible for supervising the work of more junior Cost Engineers, and provide a training and mentoring role.Â
